PORTLAND CEMENT 42.5
GREY PORTLAND
CEMENT CONSTRUCTION GRADE 42.5 ACCORDING TO UNITED
STATES
STANDARDS ASTM C 150, AS FOLLOWS:
Silicon Dioxide (SiO2) 20.8–21.5
Blain CM2/GR 3.250
Aluminium Oxide (Al2O3) 5.30
Autoclave Expansion 0.02
Ferric Oxide (Fe2O3) 3.25–3.5
Normal Consistency % 27.5
Calcium Oxide (CaO) 65.60
Initial Setting Time (Hours:Mins) 3.25 –
4.50
Magnesium Oxide (MgO%) 1.7–3.0
Hard Set (Hours:Mins) 4.54 – 6.00
Sulphur Trioxide (SO3) 2.7–3.0
Fitness Index (CM2/GM) 2800-3040
CHEMICAL
COMPOSITION
PHYSICAL
AND MECHANICAL PROPERTIES
Loss Of Ignition (LOI) 1.8–3.0
COMPRESSION
STRENGTH
Insoluble Residue % 0.1–0.7
@ 03 DAYS 2.65 – 34.2 KG/CM2
Tricalcium Silicate (C3S%) 50.0–54.4
@ 07 DAYS 37.3 – 42.5 KG/CM2
Dicalcium Silicate (C2S%) 14.2–18.2
@ 28 DAYS 52.8 – 54.6 KG/CM2
Tricalcium Aluminate (C3A%) 6.0–6.8
Tricalcium Alumino Ferrice (C4AF%) 11.6
Chromium (Cr%) 2.0Max
PHYSICAL
PROPERTIES:
SOUNDNESS AUTOCLAVE EXPANSION MAXIMUM
0.8%
MAXIMUM 0.8%
SURFACE AREA cm2/gm
(BLAINE
METHOD)
NOT LESS THAN
2800 NOT
LESS THAN 2800
INITIAL SETTING TIME (VICAT)
MINIMUM 45 min
FINAL SET TIME
(VICAT)
MAXIMUM 375 min
COMPRESSION RESISTANCE
N/mm2
CUBES 5 X 5 X 5
cm
CUBES 5 X 5 X 5 cm
MINIMUM 10.3 (1 day
)
MINIMUM 10.3 (1 day )
MINIMUM 17.2 ( 3 days
) MINIMUM 17.2 ( 3
days )
MINIMUM 27.6 ( 7
days) MINIMUM
27.6 ( 7 days)
MINIMUM 42.5 ( 28 days)
MINIMUM 42.5 ( 28days)
HYDRATION KJ/Kg AFTER 7
days MAXIMUM 290
KJ/KGM MAXIMUM
290 KJ/KGM

|